Condensing units on the roof with the installation crew

About the project

Installation of refrigeration equipment on the roof of an industrial facility. The units arrived by truck, were lifted by crane and set on their structure, with the installation crew coordinating each maneuver.

Scope

  • Lifting plan and coordination of maneuvers
  • Rooftop installation of condensing units
  • Piping connection and commissioning