About the project

CO₂ refrigeration system for a bakery plant. A network of insulated pipes runs along the roof of the hall and the gas coolers were installed on the roof, with manifolds and valves for each line.

Scope

  • System and piping network engineering
  • Manifolds, valves and insulation for each line
  • Rooftop gas cooler installation and commissioning

Project photos (33)

  • Interbake: photo 1 of 33
  • Interbake: photo 2 of 33
  • Interbake: photo 3 of 33
  • Interbake: photo 4 of 33
  • Interbake: photo 5 of 33
  • Interbake: photo 6 of 33
  • Interbake: photo 7 of 33
  • Interbake: photo 8 of 33
  • Interbake: photo 9 of 33
  • Interbake: photo 10 of 33
  • Interbake: photo 11 of 33
  • Interbake: photo 12 of 33
  • Interbake: photo 13 of 33
  • Interbake: photo 14 of 33
  • Interbake: photo 15 of 33
  • Interbake: photo 16 of 33
  • Interbake: photo 17 of 33
  • Interbake: photo 18 of 33
  • Interbake: photo 19 of 33
  • Interbake: photo 20 of 33
  • Interbake: photo 21 of 33
  • Interbake: photo 22 of 33
  • Interbake: photo 23 of 33
  • Interbake: photo 24 of 33
  • Interbake: photo 25 of 33
  • Interbake: photo 26 of 33
  • Interbake: photo 27 of 33
  • Interbake: photo 28 of 33
  • Interbake: photo 29 of 33
  • Interbake: photo 30 of 33
  • Interbake: photo 31 of 33
  • Interbake: photo 32 of 33
  • Interbake: photo 33 of 33

Have a similar project?