Gas cooler on a steel frame with copper piping

About the project

CO₂ refrigeration plant for a supermarket in Viña del Mar. The gas coolers were lifted at night to avoid disrupting the area, and the machine room holds compressors and copper manifolds with valves for each line.

Scope

  • Plant and manifold engineering
  • Night-time lifting of gas coolers
  • Machine room installation and commissioning

Project photos (21)

  • SJB 14 Norte Viña: photo 1 of 21
  • SJB 14 Norte Viña: photo 2 of 21
  • SJB 14 Norte Viña: photo 3 of 21
  • SJB 14 Norte Viña: photo 4 of 21
  • SJB 14 Norte Viña: photo 5 of 21
  • SJB 14 Norte Viña: photo 6 of 21
  • SJB 14 Norte Viña: photo 7 of 21
  • SJB 14 Norte Viña: photo 8 of 21
  • SJB 14 Norte Viña: photo 9 of 21
  • SJB 14 Norte Viña: photo 10 of 21
  • SJB 14 Norte Viña: photo 11 of 21
  • SJB 14 Norte Viña: photo 12 of 21
  • SJB 14 Norte Viña: photo 13 of 21
  • SJB 14 Norte Viña: photo 14 of 21
  • SJB 14 Norte Viña: photo 15 of 21
  • SJB 14 Norte Viña: photo 16 of 21
  • SJB 14 Norte Viña: photo 17 of 21
  • SJB 14 Norte Viña: photo 18 of 21
  • SJB 14 Norte Viña: photo 19 of 21
  • SJB 14 Norte Viña: photo 20 of 21
  • SJB 14 Norte Viña: photo 21 of 21

Have a similar project?